Event

Installation of Chamber System

Installation of multi-channeled chamber system was carried out at Oil Palm Plantation in Pasoh, Negri Sembilan. Evaluation of the biological and physical cycle (nutrient and carbon cycle) in oil palm plantation will be conducted by using this system.